Two people reviewing drawings and a tablet on a desk beside a hard hat

Design


Safely Store Fuel in Any Building

We integrate fire, compliance and structural requirements early, protecting programme certainty and ensuring mission-critical fuel systems perform exactly as intended.

Fuelchief in numbers

500+

Projects Completed

Across fuel storage and critical power generation

40+

Years of Experience

Deep industry expertise & proven track record

9001

ISO-Certified

Committed to consistent quality, customer satisfaction, and continuous improvement

400+

SuperVault Tanks Installed

Experience across every major industry

Design Out Risk

In mission-critical projects, fuel storage is shaped by fire strategy, hazardous compliance, seismic design and the project’s critical path. Through early contractor engagement (ECI), we align these interfaces upfront. In high-risk industries, we can simplifying specification and reduce risk during the design phase. The result is clearer documentation, smoother coordination, and increased confidence.

Why design first

Design is The Critical Path

Often, by the time the tank is considered, the plant room is already set, and access is tight. The tank doesn’t fit, or the fire rating doesn’t work. That forces redesign, slows consent, and puts the fuel system on the critical path.

Why Design First

Why design first

Align Compliance and Avoid Rework

Fuelchief works with the design team early to size the tank, confirm fire rating, check access, and align compliance. We resolve these against real site conditions so the system fits, gets approved, and installs without rework.

Why Design First
  • Programme certainty

    Keeps fuel systems off the critical path and avoids late-stage delays.

  • Fewer redesigns & RFIs

    Integrated engineering reduces comms issues and costly rework.

  • Compliance clarity

    Clear fire, seismic and hazardous documentation ready for review.

  • First-time commissioning confidence

    Systems perform as specified under load, without last-minute surprises.

Integrated approach

Remove Risk at Every Stage

Our approach connects design and manufacture with the installation team on site. We engineer out risk early, manufacture to your site constraints, and work with experienced local partners to simplify integration and compliance.

  • Design

    Engineer fuel solutions around your site constraints, uptime requirements, and long-term operational realities. Align early to ensure buildability and risk management.

  • Manufacture

    We manufacture fuel systems with the precision high-risk environments demand, built exactly to spec and highly tested.

  • Installation

    We work alongside local installation partners to coordinate tank interfaces, documentation and handover, helping keep the fuel scope straightforward on site.

Case Studies

View all

Higgins Group Case Study

The SuperVault solution provided a certified compliant tank for the Test Certifier to sign off on without any issues.

Nelson City Council

A precision placed series of SuperVault’s measured and constructed to the millimetre for the allocated space available. The tanks have been functioning successfully for the plant.

RD Petroleum Aviation Fuel Upgrade at Franz Josef Glacier

Replacing five ageing tanks with one, RD Petroleum needed a 60,000L aviation fuel tank transported clear across New Zealand to Franz Josef Glacier. Here's how a custom SuperVault made the journey and now keeps helicopter tour operators refuelled on-site.

Powerco

Fuelchief teamed up with Terra Cat to provide a Fuelchief DCD100 diesel fuel tank to Powerco for critical power backup.

Relocatable SuperVault For Client

See how our SuperVault was the ideal solution because of it's relocatable design and compliance that it proved to be a real asset.

University Of Canterbury

Our latest SuperVault case study on a how our 4-hour fire rated tank replaced an underground fuel tank for the University.

Sandspit Marina

Fuelchief supplies tank to Sandspit Marina, view the latest results of the transaction and why the manager is looking for another tank from us.

Airways: Critical Control Tower Upgrades

The Fuelchief SuperVault 4 hour fire rated fuel tank was custom made to ensure the critical environment of a aviation control tower was met.

NZ Bus Auckland Depot Upgrade

See how the SuperVault Cylindrical 4 hour fire rated tank ensured refuelling compliance for NZ Bus. Check out the latest case study.

Air New Zealand Jet Engine Testing Facility

Fuelchief supplied Air New Zealand, one of the most recognised global airlines in the world, a SuperVault for their new testing facility.

Christchurch Hospital

Chirstchurch Hospital, consultants needed a SuperVault tank to back up critical generators to ensure continual power in an outage.

Allied Petroleum iTank in Invercargill

The Fuelchief SuperVault 4 hour fire rated fuel tank was custom made to ensure the critical environment of a aviation control tower was met.

Downer Bitumen Plant Upgrade Project

Up at Port Whangarei Downer recently took delivery of a SuperVault SVR-4999 and also a DC100 Diesel tank – both supplied via Z Energy for Downers bitumen plant upgrade.

Citibank Gets a SuperVault

ECL Group were engaged by their client Citibank to supply and install a suitable diesel tank system to supply fuel to a large generator in a multi-storey building in downtown Auckland.

Terra Cat Praxis Generator Base Tanks

ECL Group were engaged by their client Citibank to supply and install a suitable diesel tank system to supply fuel to a large generator in a multi-storey building in downtown Auckland.

Air BP Queenstown Airport Project

Queenstown Airport is a pristine location with the importance of environmentally secure and safe storage of fuel. For Air BP the SuperVault’s have been providing this for several years and will continue to do so for many years to come.

Common Questions

Fuel systems should be engaged during concept or schematic design to reduce redesign risk and protect the critical path.

In many projects, yes. A compliant fire-rated tank can simplify the building layout and reduce footprint.

We align fire rating, hazardous area classification and seismic requirements into one coordinated engineering solution.

Consent typically requires fire certification, seismic producer statements, hazardous compliance documentation and engineered drawings.

By resolving structural loads, venting, access and compliance interfaces during early design and ECI stages.

We align tank sizing, fuel interfaces, reticulation and commissioning requirements to ensure seamless integration.

If you need critical fuel and a partner you can rely on, let’s talk.

We are here to help. Contact our friendly team any time.

Please type your message here...

Staging copy: not the live site