Our client are in the gas exploration market. When drilling for new wells, they have to set up temporary processing equipment for well testing. This takes place for at least 6 – 9 months, where they take well fluids and separate them, such as gas, oil, water – the oil gets stored on site and is classed as HSNO 3.1A.
Our client came to Fuelchief to discuss plans to build a SuperVault, as the only other alternative for storing a flammable liquid involved a concrete bund as a permanent structure. They also required some additional features, such as brackets for a custom walkway and pipework.