Commissioning verifies that the installed tank, pipework, vents, pumps and controls operate correctly under real conditions. It confirms compliance, checks documentation and ensures the system is ready to support the generator without issue.
Fuelchief in numbers
500+
Projects Completed
Across fuel storage and critical power generation
40+
Years of Experience
Deep industry expertise & proven track record
9001
ISO-Certified
Committed to consistent quality, customer satisfaction, and continuous improvement
400+
SuperVault Tanks Installed
Experience across every major industry
Make Continuous Power a Reality
Fuel storage inside buildings follows a defined set of industry best practices. In mission-critical environments, manufacturing quality matters. From fire separation and ventilation to structural loading and integrity. We build to those standards every day, ensuring each tank reflects the site and the correct compliance pathway.
SuperVault
The SuperVault Tank
Do you have a project that requires fuel supply for backup power? Whether it be for critical industries such as healthcare, data centres or infrastructure, we have the solution. The Supervault tank by Fuelchief is a 4-hour rated fuel storage system certified to SWRI 95-03, which is above and beyond international standards.
The SuperVault tank has proven time and time again that it offers undisputed benefits over a fire-rated room, namely,
- Saving space, construction time, and building cost
- Provides cleaner fuel for critical, round-the-clock supply
- Critical environmental security long-term
- Simplicity of specifying, installing, and complying
Coordinated design
Manufactured to Fit
Tanks that don’t match site constraints create problems during installation. Access is tight, connections don’t line up, and rework follows. Fuelchief builds to the coordinated design, checking dimensions, connections, and interfaces so the system arrives ready to place, connect, and install without modification.
Industry-specific manufacturing
Built For The Environment it Serves
Not every project needs the same solution. Some environments demand fully integrated fire-rated systems. Others require tanks housed within engineered fire rooms, coordinated with structural, mechanical and hazardous requirements. We manufacture to suit the building, the industry and the operational load profile, ensuring each system reflects real site constraints, not catalogue assumptions.
Multi-Hazard Approved to the Highest Global Standards
The fuel tank storage industry is constantly challenged with increasingly stringent fire and impact exposure requirements for above ground storage tanks. At Fuelchief (and our former company Advanced Fuel Tanks), we have collaborated for decades with the Southwest Research Institute (SwRI) in San Antonio Texas who are a key body in performance testing above ground fuel tanks.
-
4-Hour fire test at 2,000°F
The first step in the multi hazard test is a 4-hour fire test in the San Antonio Texas testing facility. The kiln reaches 2,000°F to simulate a real fire.
The internal temperature of the tank did not exceed 165°F.
-
Multi-Hazard Testing: Hose, Projectile & Battering Ram
After the high-intensity Fire Exposure test, the tank is exposed to the cooling and erosive effects of the hose stream, ammunition projectile test, then a Heavy Vehicle Impact Test.
-
Final 2-Hour Fire Test
In this additional test, the tank is then given a fire rating level of 240/240/240 which is in accordance with AS1940. The additional exposure of the tank ensures that it can be re-used after an event (such as earthquake, fire, impact and the like).
Common Questions
We align installation sequencing with structural, mechanical and electrical contractors to reduce clashes and interface gaps. Clear drawings, defined responsibilities and early coordination keep site activity controlled.
Most risks sit in the interfaces - penetrations, vent routing, slab loads, hazardous zoning and documentation sign-off. Careful planning and verification reduce friction during commissioning.
We install to approved drawings, verified specifications and applicable standards, documenting each step to support final sign-off and consent requirements.
Yes. Installation can be staged and coordinated to minimise disruption, particularly in hospitals, data centres and infrastructure facilities where uptime matters.
As-built drawings, compliance certifications, fire-rating documentation and commissioning records are typically required before the system is signed off.
If you need critical fuel and a partner you can rely on, let’s talk.
-
Phone
AUS 1300 899 038
(Australia) -
Phone
NZ / INT +64 3 384 2380
(New Zealand & United States) -
Postal address
P.O Box 160175
Hornby, 8441 -
Customer support
info@fuelchieftanks.com
We are here to help. Contact our friendly team any time.