e3 Building Services were focused on providing the best system they could for Airways, ensuring compliance was exceeded and the critical facility would continue to operate in an event. Due to the Tier 3 and IL4 ratings, companies were sought that would partner with and help achieve this vision.
The SuperVault tank was chosen for a number of reasons. Both sites had slightly different installation layouts, however the power requirements were the same – both had a 300kVA generator, and both were required to have a run-time of 48 hours. The rectangular SVR-4999L was selected.