BACKUP POWER FOR


Mission-Critical Fuel Solutions For Hospitals and Public Health

When the grid fails, patient care cannot. Hospitals, acute facilities and public health infrastructure require fuel systems that are compliant, resilient and engineered to perform when they are needed most. We design, manufacture and install mission-critical fuel solutions that protect continuity of care.

Mission-critical healthcare

Protecting What is Critical

We engineer healthcare fuel systems to perform exactly as specified when they’re needed most.

In hospital projects, fire strategy, seismic integrity and spatial constraints all add to pressure, but they don’t have to.

From early design through to installation and commissioning, we take responsibility for the fuel system, coordinating trades, closing compliance loops and ensuring performance without compromise.

Mission-Critical Healthcare

The Fuelchief system

We take full ownership from concept, to commissioning and compliance.

Healthcare projects involve multiple stakeholders, tight programmes and strict regulatory oversight. Our role is to remove uncertainty across the fuel system lifecycle.

  • Design

    Early-phase design support that aligns fuel storage with fire rating, seismic demands and spatial constraints.

    • Fire & hazardous integration

      Aligned to AS1940, WorkSafe and healthcare facility standards.

    • Seismic coordination

      Engineered for IL4 and critical building classifications.

    • Spec & consent support

      Drawings, compliance matrices and documentation prepared for review.

  • Manufacture

    Built to meet healthcare fire-rating, durability and environmental protection requirements.

    • Certified fire-rated systems

      True 4-hour fire rating with SwRI certification.

    • Clean fuel integrity

      Designed to protect generators operating in 24/7 environments.

    • Precision fabrication

      Manufactured to approved drawings and exact site constraints.

  • Install

    Installed with discipline in live healthcare environments, where coordination and safety matter.

    • Controlled site execution

      Cranage, access and sequencing aligned to hospital operations.

    • Compliance closed on site

      Fire integrity and hazardous requirements verified and documented.

    • Commissioning alignment

      Integrated with generator suppliers for seamless startup.

Remove the Pressure of Installation

If things change on installation day, we can adapt. Our role is to control the variables that matter, coordination, compliance and commissioning, so that the installation doesn’t add pressure to your programme of work.

Installed to approved drawings, verified against fire and seismic requirements, documented for consent.

  • Coordinated Site Execution

    We manage cranage planning, lifting methodology, access constraints and sequencing alongside Tier 1 contractors. Vent routes, slab loads and penetrations are verified before install, reducing interface risk and protecting programme milestones.

  • Compliance Closed on Site

    Installation is completed to approved drawings and documented against fire, seismic and hazardous requirements. As-builts, certifications and commissioning records are prepared for smooth consent sign-off.

  • Low Friction Commissioning

    We align installation with generator suppliers and electrical teams, verifying reticulation, controls and venting prior to startup. The system is handed over clean, tested and ready for load.

THE SUPERVAULT TANK

Make Continuous Power a Reality With the SuperVault Tank

The SuperVault tank has proven time and time again that it offers undisputed benefits over a fire-rated room and going underground, namely:

  • Saves space, construction time, and building cost
  • Provides cleaner fuel for critical round-the-clock supply
  • Critical environmental security long-term
  • Simplicity of specifying, installing, and complying
THE SUPERVAULT
  • IL4 and post-disaster ready

    Engineered to remain operational when the building must continue functioning.

  • True 4-hour fire-rated solutions

    Certified systems aligned to AS1940 and healthcare fire strategies.

  • Consent-ready documentation packs

    Drawings, certifications and compliance matrices prepared.

  • Commissioned for live environments

    Integrated carefully within operational hospitals without disrupting critical services.

Health Case Studies

View all

Christchurch Hospital

Chirstchurch Hospital, consultants needed a SuperVault tank to back up critical generators to ensure continual power in an outage.

Your key contacts for health

Our engineers and project managers know how to deliver fuel systems into live, high-stakes environments like hospitals.

View the team

Frequently Asked Questions

Most hospital projects require 4-hour fire-rated fuel storage where volumes exceed regulatory thresholds, aligned to AS1940 and local authority requirements.

Where buildings are classified for high importance or post-disaster function, fuel systems must be engineered to remain operational after seismic events.

In many healthcare projects, a certified 4-hour fire-rated tank can reduce footprint and simplify the overall fire strategy.

Compliance is addressed through correct tank selection, ventilation design, hazardous area classification and a documented approval pathway aligned to local regulations.

Spatial constraints, late compliance interpretation and coordination gaps between fire, structural and electrical disciplines are typical risk areas.

Commissioning is staged and coordinated with facilities and generator teams to verify performance without disrupting hospital operations.