Fire rating depends on tank location, volume, and local regulations such as AS1940. In many data centre projects, 2-hour or 4-hour fire-rated tanks are required to avoid additional fire-rated rooms and simplify compliance.
Passionate about delivery
Clean, Reliable Fuel
In critical environments, power loss isn’t acceptable. Clean, reliable fuel is essential to system start-up and ongoing operation.
Fuelchief works with consultants and project teams to simplify specifications, installation, and compliance. At Fuelchief, we are passionate about delivering the most compliant solution for your project.
THE SUPERVAULT TANK
Make Continuous Power a Reality With the SuperVault Tank
The SuperVault tank has proven time and time again that it offers undisputed benefits over a fire-rated room and going underground, namely:
- Saves space, construction time, and building cost
- Provides cleaner fuel for critical round-the-clock supply
- Critical environmental security long-term
- Simplicity of specifying, installing, and complying
The Fuelchief methodology
Full Ownership
Data centre projects involve multiple stakeholders, tight programmes, and zero tolerance for downtime. Our role is to remove uncertainty across the fuel system lifecycle.
-
Design
Early design support aligned to civil layouts, load requirements and compliance rules.
-
Environmental and fire compliance
Designed to meet AS1940 and local authority requirements.
-
Structural and civil coordination
Integrated with slabs, bunds and access planning.
-
Consent documentation
Drawings and compliance packs prepared for approval.
-
-
Manufacture
Built for durability in exposed and high-demand environments.
-
Fire-rated solutions
Certified systems aligned to project needs, including the SuperVault tank.
-
Long-term integrity
Designed to protect generators during extended outages.
-
Precision fabrication
Manufactured to approved drawings and site constraints.
-
-
Install
Installed safely across large or remote sites.
-
Controlled site execution
Aligned with civil, mechanical and electrical teams.
-
Environmental controls
Integrity, drainage and safety checks completed.
-
Commissioning readiness
Tested and documented before handover.
-
Frequently Asked Questions
Yes, if the tank meets fire rating, ventilation, and hazardous area requirements. Fire-rated tanks are often used to allow internal installation without constructing separate fire-rated enclosures.
Sizing depends on generator load, required runtime, redundancy strategy, and refuelling logistics. Data centres typically require sufficient capacity to meet uptime requirements while allowing for safe refilling during operation.
Fuel systems must comply with standards such as local fire codes, environmental regulations, and hazardous area classifications. Requirements vary by region and project, so early coordination with authorities is critical.
Fuel quality is maintained through filtration, water separation, tank design, and regular fuel polishing. Poor fuel quality can impact generator performance, so systems are designed to minimise contamination and degradation over time.
Fuel systems should be considered early in design. Late-stage coordination often leads to space constraints, compliance issues, and redesign. Early involvement ensures the system fits, meets regulations, and integrates with generator infrastructure.
If you need critical power and a partner you can rely on, let’s talk.
-
Phone
NZ / INT +64 3 384 2380
(New Zealand & United States) -
Postal address
P.O Box 160175
Hornby, 8441 -
Customer support
info@fuelchieftanks.com
We are here to help. Contact our friendly team any time.